1 min read

A large steel construction has been dominating the complete archaeological area of Kato Paphos, from the Hellenistic Theatre and the caves of the Fabrica Hill, until the Paphos archaeological park at the Paphos  port. It is a much anticipated footbridge which will connect the west and the east sides of the archaeological areas which today are cut off due to the Apostle Pavlou Avenue. This will give visitors the chance to take a walk above ground, along the archaeological treasures in the area.

The footbridge is part of the projects which are in full swing, aiming to join the archaeological sites in Kato Paphos. The large footbridge will connect the west with the east part, one side being near the Roman Hotel and the other side being at the Fabrica Hill.

The project is a study of the archaeological office Simpraxis which won the contest that had been conducted by the government. Based on the winning study, their strategy revolves around a combination of the old as well as the new parts of town.

Kato Paphos Bridge location map: 

Near Kato Paphos Bridge

Other places within a short drive, closest first.

Nearby Places and things to do (within 5 km radius)

Nicosia

Cyprus Museum of Natural History

The Cyprus Museum of Natural History, located in Nicosia, is a fascinating destination that offers visitors a comprehensive look at the natural heritage of Cypr

Nicosia

Paramythoupoli

Every holiday season, Paramithoupoli (Storyland) transforms into a festive wonderland, bringing the magic of Christmas to life for families and children.

Nicosia

Athalassa Dam Nature Trail

Location: Athalassa Dam Picnic site – Southwest entrance District: Nicosia Starting Point: Picnic area of the southwest entrance.

Famagusta

Gypsou Village

Gypsou is a community in the occupational district of Ammochostos, also known locally as “Sakkohori” as in the past, the residents dealt with the construction o

Nicosia

Nicosia City Mall

The Nicosia City Mall will be located in the town of Nicosia, in the Lakatamia area. The Mall construction began in 2011 and the project was expected to be c

Pages